Room Pressure Integrity Testing
A fire protection system needs to operate to the best of its ability and to maximum efficiency.  To do this, adequate containment of the extinguishant within the risk area is necessary and it is therefore a requirement that integrity testing is carried out on a regular basis (at least annually).  The 'integrity' of an enclosure is its capability to retain an extinguishing agent.

The test does not involve the discharging of extinguishant, and can be repeated at very short notice and therefore allowing more than one test (if required) on a single visit.

A written report is issued on completion of each test and a certificate issued if a positive result is achieved.  This certificate is valid for one year unless changes have been made to the room during the year (e.g. equipment upgrade and enclosure modification) - if any of these have occurred then a retest should be undertaken after all works have been completed.  If tests indicate failure to meet the required retention time, then a survey is carried out noting leakage areas.  A report is then submitted indicating remedial sealing works required to improve results.
 
Our Services
CHAS_Logo.jpg
ConstructionLine.jpg
iso9001.jpg
Design by BT Web Consult